North West Coast Hway Project

Principal: Main Roads
Location: South Eastern Pilbara, WA
Start Date: December 2014
Status: In Progress

Stage 1: Overlaying and widening approximately 40 km of road between Minilya and Mia-Mia, and replacing old culverts with new culverts. These works will take a year to complete.
Stage 2: Reconstructing, overlaying, widening and resurfacing approximately 107 km of road between Mia-Mia and Barradale, replacing floodways at Cave Creek and Goodeman Creek with bridges, constructing passing lanes at two locations and replacing all culverts on the route. Stage 2 is expected to take up to two years to complete and will start work in early 2015.