Principal: Fortescue Metals Group
Client: SRG Gobal
Location: Pilbara Region, Western Australia
Status: In-Progress
Survey Dynamics have been contracted to provide survey services to for the construction of 17 wind turbine pads and concrete footings for the FMG Bonney Downs Wind Farm. There are 3 x 72m3 concrete footings for each of the 17 turbine pads and 49 bolts per concrete footing. The project also includes 33kv powerline pads and corridor.
Scope of works includes:
Earthworks
- Construction of the access tracks and pads for the turbines. This involves bulk earthworks, subgrade and basecourse conformance, culvert installation and general machine control troubleshooting and design files.
- End of month drone flights for claim volumes
- Survey asbuilt of underground services
Concrete
- Setup of site control points for each turbine pad
- Setout and asbuilt of the piling works
- Setout for excavation of the concrete footing for each wind turbine
- Survey in order to keep turbine anchor bolts in place whilst the concrete is being poured
- Pre & post-pour surveys to be completed on all concrete structures with detailed pre pour reports submitted before the footings can be poured