Principal: Covalent Lithium
Client: Decmil
Location: Mount Holland, Western Australia
Status: In-Progress
This project involves the construction of a 113km road linking the Covalent Lithium Mine with Great Eastern Highway. Survey Dynamics will be undertaking the following works:
- Drone flights of the 113km road, borrow pits, stockpiles and side roads
- Control network over the length of the job
- Machine control for upwards of 50 machines at peak construction
- Mass haul volume calculations with over 1 million cubic metres of soil to be used during construction.
The project commenced in September 2023 and is expected to take 2 years to complete. Survey Dynamics is expected to have a crew of 8-10 people at the height of construction.